High duty flood barrier

City of Paris & French River Authority e.g.

The overall objective of the flood protection scheme, implemented in the 13th quarter of Paris, south-east, was to integrate our barriers  within an urban environment and under restrictive architectural regulation ( barriers along quay facing river Seine) and especially  to take very high water pressure ( 100 tons) as applied on the barrier installed under the famous bridge "Pont National".

Therefore the global objective and technical difficulty of this project is to manufacture a fully concealed flood barrier deemed to take high duty stress but being hidden to match the restrictive regulation of the French historical monuments board.

Specific objective :

  • To provide the Contracting authority with assurance that our flood barrier will protect and resist to century flood ( calculation note, shop drawing, of all parts , full set of documents and notice about ways and means to install & dismantle the barrier)
  • To provide the Contracting authority with assurance that our barriers will comply with the Parisian historical building regulation  (detailed fixation and anchorage system 3D drawing)
  • To provide the Contracting Authority with assurance that the services provided under the supply contract ensure a successful protection of the selected quarter and easy handling for the Contracting maintenance team (organization and delivery of training and operational notices)
  • Photo 1
  • Photo 2
  • Photo 3
  • Photo 4
  • Photo 5
MSU-BERGTEC GUARANTEE
  • A very low leak rate < 3 liters / hour / sq.m
  • Quick and easy installation : 5 mn/ sq.m. of barrier
  • Entirely removable/mobile system
  • High mechanical resistance alloys
  • Suitable for very hot region or very cold ( tested below -60°C)
  • Maintenance free
  • Flood barriers guaranteed 20 years
WE MASTER THE WHOLE MANUFACTURING PROCESS
  • Entirely manufactured protection in marine aluminium alloys supplied by international Swiss aluminium extruder company
  • We have our own engineering office with experience staff
  • We take in account ground studies to draft in collaboration with contractor foundation to support our intermediate posts
  • Goods are delievered ready-to-be installed, thanks to our millimetre precise production.
  • Thanks to our very long experience, achieved since 1970, we are able to find out and provide the best flood barrier system suitable to YOUR requirement!